Study in Pictures🌐 English (United States)
Concrete Contractor Illustrated

Digital book in PDF · read it on your phone or print it

Concrete Contractor Illustrated

Mix design, subgrade, formwork, rebar, placing, finishing, joints, curing and cubic yards. Every topic gets its own page: the drawing first, then what you need to remember.

  • 66 illustrated pages
  • English
  • 30-day guarantee
US$ 27US$ 63
Get the book · US$ 27

Price shown for: United States. In other countries, the checkout shows the price that applies there.

About this book

What it is

Mix design, subgrade, formwork, rebar, placing, finishing, joints, curing and cubic yards. Every topic gets its own page: the drawing first, then what you need to remember.

Who This Book Is For
  • You're studying for your license
  • Your exam date is close
  • You already run your own jobs
What it covers
  1. How Concrete Works
  2. Ordering and Testing
  3. Subgrade and Base
  4. Formwork
  5. Reinforcement
  6. Placing and Finishing
  7. Joints, Curing and Weather
  8. Concrete Math
  9. Defects, Safety and Exam Review
Language
English (United States)
Pages
66
Format
Digital book in PDF · read it on your phone or print it
Price
US$ 27 (United States)
Delivery
This is a digital PDF book sent to your email: nothing is printed or shipped.
30-Day Guarantee
30-day guarantee: if a file doesn't open, if the content isn't what the product page describes, if you were charged twice or the email never arrived, write to us and we'll refund you in full.

Look Inside the Book

Aggregates are roughly 60–75% of the volume; cement and water are the glue.
Aggregates are roughly 60–75% of the volume; cement and water are the glue.
Delivery ticket, line by line: psi, slump, max aggregate, air, admixtures, batch time.
Delivery ticket, line by line: psi, slump, max aggregate, air, admixtures, batch time.
Subgrade, subbase, base: IRC R506 asks 4 in of base below grade, 3-1/2 in slab minimum
Subgrade, subbase, base: IRC R506 asks 4 in of base below grade, 3-1/2 in slab minimum
Side forms come off early; shores stay until the engineer or spec allows
Side forms come off early; shores stay until the engineer or spec allows
Far corner toward the truck, short vertical drops, prime the line, and no extra water at the chute (ASTM C94).
Far corner toward the truck, short vertical drops, prime the line, and no extra water at the chute (ASTM C94).
Shrinkage, temperature and settlement: three causes, one answer, the joint.
Shrinkage, temperature and settlement: three causes, one answer, the joint.
1 cu yd = 27 cu ft · convert inches ÷ 12 before multiplying
1 cu yd = 27 cu ft · convert inches ÷ 12 before multiplying

Take a Look at the 9 Parts and 62 Topics

How Concrete Works

pp. 5-11
  1. The 4 Ingredients and What Each One Does
  2. Water-Cement Ratio: The Number That Sets Strength
  3. Hydration: Concrete Cures, It Doesn't Dry
  4. Compressive Strength in psi
  5. Portland Cement Types I to V
  6. Admixtures at a Glance
  7. Air Entrainment and Freeze-Thaw

Ordering and Testing

pp. 12-16
  1. Reading a Mix Design and Batch Ticket
  2. Ready-Mix Rules: Discharge Time and Drum Revolutions
  3. The Slump Test Step by Step
  4. Air Content and Temperature Tests
  5. Making Test Cylinders

Subgrade and Base

pp. 17-22
  1. Subgrade vs Subbase vs Base
  2. Soil Types and Bearing
  3. Compaction and the Proctor Test
  4. Vapor Retarders Under Slabs
  5. Grade, Slope and Drainage
  6. Frost Depth and Footing Bottoms

Formwork

pp. 23-27
  1. Slab Forms: Stakes, Boards and Kickers
  2. Footing and Wall Forms
  3. Form Release and Stripping
  4. Curved Forms and Radius Work
  5. Tolerances: How Flat Is Flat

Reinforcement

pp. 28-34
  1. Rebar Sizes: The Number Is Eighths
  2. Welded Wire Reinforcement
  3. Concrete Cover: The 3 Exposures
  4. Lap Splices and Bar Diameters
  5. Chairs, Dobies and Tie Wire
  6. Hooks, Bends and Dowels
  7. Post-Tensioned Slabs: Recognize and Respect

Placing and Finishing

pp. 35-43
  1. Placing Methods: Chute, Pump, Buggy
  2. Consolidation and Vibrators
  3. Screeding to Grade
  4. The Finishing Order, Always the Same
  5. Bleed Water: Wait for It
  6. Bull Float and Darby
  7. Edging and Hand Jointing
  8. Power Troweling
  9. Broom, Swirl and Exposed Aggregate

Joints, Curing and Weather

pp. 44-51
  1. Why Concrete Cracks
  2. Control Joint Spacing: 24 to 36 Times the Thickness
  3. Sawcutting: Depth and Timing
  4. Isolation and Construction Joints
  5. Curing Methods
  6. Hot Weather Concreting
  7. Cold Weather Concreting
  8. Sealers and Protection

Concrete Math

pp. 52-59
  1. The Magic Number: 27
  2. Cubic Yards for a Slab, Solved
  3. Footings and Grade Beams
  4. Columns, Piers and Round Work
  5. Stairs and Steps
  6. Waste Factor and Ordering
  7. Rebar and Mesh Takeoffs
  8. Area, Slope and Fractions on the Exam

Defects, Safety and Exam Review

pp. 60-66
  1. Surface Defects: Scaling, Dusting, Crazing
  2. Cracks, Curling and Blisters
  3. Honeycombing, Cold Joints and Pop-outs
  4. Jobsite Safety: Cement Burns and Silica
  5. Trenches, Pumps and Rebar Caps
  6. The 25 Numbers to Know by Heart
  7. How to Study the Last Two Weeks

Who This Book Is For

You're studying for your license

What you already do with your hands, put into the words and numbers the exam uses, one topic per page and always in the same order.

Your exam date is close

The 25 numbers to know, the cubic yard math solved step by step and a plan for the last two weeks, all easy to find at a glance.

You already run your own jobs

A printed reference for the truck: cover, laps, joint spacing and takeoffs on one page each, to check before a pour or to show your crew.

Plus: 2 Free Books

Concrete Exam Practice Questions — Answers Explained
BONUS 1

Concrete Exam Practice Questions — Answers Explained

Exam-style questions on every chapter, each answer explained with the page to go back to, so you know what's solid and what to review.

The 15 Most Common Concrete Mistakes — Before & After
BONUS 2

The 15 Most Common Concrete Mistakes — Before & After

The most frequent errors on the slab, drawn side by side with the right way, from troweling too early to joints cut too late.

30-Day Guarantee

30-day guarantee: if a file doesn't open, if the content isn't what the product page describes, if you were charged twice or the email never arrived, write to us and we'll refund you in full. You pay once. No subscriptions.

Frequently Asked Questions

Is it for me if I've been finishing concrete for 20 years and haven't taken a written exam in decades?

Yes. It doesn't teach you to finish concrete: you already do that. It takes what you know on the slab and puts it into the terms and numbers the exam uses: cover, laps, Proctor, ticket limits, tolerances, cubic yards. It goes in order, so you skim what you know and slow down where the exam wording trips you up.

Does it work for my state's exam, and where does the content come from?

It's built on ACI 318, ACI 302.1R, 305R, 306R, 308R and 117, ASTM C94, C143, C31, C39 and C231, and the IRC chapters on foundations and slabs, checked against the current published editions. Each state picks its own reference books and editions, so open your candidate bulletin and compare its list with these sources before you buy.

Is it official material?

No. It's independent study material. It doesn't give you a certificate, a license or course hours, and it isn't affiliated with or endorsed by the CSLB, any state licensing board, ACI, ASTM, ICC, NASCLA, PSI or OSHA.

Does it replace a course or an exam prep class?

No. It's a review of the technical trade section, made to study alongside your course or on your own. It doesn't cover the Law & Business exam.

Are the practice questions the ones on the exam?

No. They are exam-style questions written for this book, each with the answer explained and the page to go back to. They are not official exam questions.

When and how does it arrive?

As a PDF by email, to the address you enter at checkout. The 2 bonus books come the same way.

Do I have to pay every month?

No. It's a one-time payment. No subscription.

Can I have it on paper?

Yes. The PDF is made to print at home or at a print shop, so you can keep it in the truck and write on it.

How does the refund work?

You have 30 days. We refund everything if the file won't open, if the book isn't what you see on this page, if you were charged twice or if the email doesn't arrive: just email us.

US$ 27US$ 63
Get the book · US$ 27

This is a digital PDF book sent to your email: nothing is printed or shipped.

More books on this topic

Concrete Field Testing Illustrated

Get ready for your concrete field testing technician exam with one illustrated page per topic: sampling, temperature…

From US$ 27 US$ 63

Tile Contractor Illustrated

Tile installation explained one topic per page, every topic drawn: substrates and deflection, layout without slivers…

From US$ 27 US$ 63

Paver Installer Illustrated

The paver installer's study book with every topic drawn: the pavement cross-section layer by layer, excavation depth by…

From US$ 27 US$ 63

Earthwork & Paving Illustrated

Earthwork and paving explained one topic per page, every concept drawn: read grading plans at a glance, work cut and…

From US$ 27 US$ 63

Roofing Contractor Illustrated

The roofing trade, one topic per page, every page a clear drawing: roof anatomy, pitch and squares with worked…

From US$ 27 US$ 63

Masonry Contractor Illustrated

Brick, block, stone, mortar, veneer and estimating, one topic per page with a big clear drawing on every page. Made for…

From US$ 27 US$ 63