Study in Pictures🌐 English (United States)
Solar PV Installer Illustrated

Digital book in PDF · read it on your phone or print it

Solar PV Installer Illustrated

Cold Voc, string limits, the 125% and 120% rules, rapid shutdown, grounding, interconnection, storage and commissioning. Every topic gets its own page: the drawing first, then what you need to remember.

  • 68 illustrated pages
  • English
  • 30-day guarantee
US$ 27US$ 63
Get the book · US$ 27

Price shown for: United States. In other countries, the checkout shows the price that applies there.

About this book

What it is

Cold Voc, string limits, the 125% and 120% rules, rapid shutdown, grounding, interconnection, storage and commissioning. Every topic gets its own page: the drawing first, then what you need to remember.

Who This Book Is For
  • You're moving into solar as an electrician
  • Your PVIP exam date is set
  • You already lead a crew
What it covers
  1. The System as One Path
  2. String Sizing
  3. Current, Conductors and OCPD
  4. Disconnects, Rapid Shutdown and Fault Protection
  5. Grounding and Bonding
  6. Interconnection
  7. Storage, Mechanical and Safety
  8. Commissioning and Labels
  9. Exam Review
Language
English (United States)
Pages
68
Format
Digital book in PDF · read it on your phone or print it
Price
US$ 27 (United States)
Delivery
This is a digital PDF book sent to your email: nothing is printed or shipped.
30-Day Guarantee
30-day guarantee: if a file doesn't open, if the content isn't what the product page describes, if you were charged twice or the email never arrived, write to us and we'll refund you in full.

Look Inside the Book

3 modules in series: 148.5 V, 13.9 A · in parallel: 49.5 V, 41.7 A
3 modules in series: 148.5 V, 13.9 A · in parallel: 49.5 V, 41.7 A
Design low temp = ASHRAE extreme annual mean minimum (690.7 Informational Note)
Design low temp = ASHRAE extreme annual mean minimum (690.7 Informational Note)
690.12(B): ≤ 30 V outside, ≤ 80 V or UL 3741 inside, within 30 seconds
690.12(B): ≤ 30 V outside, ≤ 80 V or UL 3741 inside, within 30 seconds
690.41(A) and 690.42: ground reference through the inverter's GFDI
690.41(A) and 690.42: ground reference through the inverter's GFDI
UL 1741 SB / IEEE 1547-2018: stop within 2 s on island, reconnect after 300 s by default
UL 1741 SB / IEEE 1547-2018: stop within 2 s on island, reconnect after 300 s by default
Inspection → bonding → polarity/Voc → Isc → insulation → start-up → rapid shutdown → documents.
Inspection → bonding → polarity/Voc → Isc → insulation → start-up → rapid shutdown → documents.
690.7(D), 690.13(B), 690.12(D), 705.10, 705.12(B), 706.15: every label on one map.
690.7(D), 690.13(B), 690.12(D), 705.10, 705.12(B), 706.15: every label on one map.
Exam day: handbook rules, article→section→table, time per question, five pages to review.
Exam day: handbook rules, article→section→table, time per question, five pages to review.

Take a Look at the 9 Parts and 64 Topics

The System as One Path

pp. 5-11
  1. From the Cell to the Utility Meter
  2. Reading a Module Datasheet
  3. Temperature Coefficients
  4. Series vs. Parallel
  5. String, Micro or Optimizer
  6. Shading and Bypass Diodes
  7. Where Each Rule Lives in the NEC

String Sizing

pp. 12-19
  1. String Sizing in 5 Fixed Steps
  2. Finding the Design Low Temperature
  3. Cold Voc With the Manufacturer's Coefficient
  4. Cold Voc With Table 690.7(A)
  5. Maximum Modules per String
  6. Minimum Modules for the MPPT Window
  7. Parallel Strings and Inverter Input Current
  8. DC/AC Ratio and Clipping

Current, Conductors and OCPD

pp. 20-28
  1. Maximum Circuit Current: Isc × 1.25
  2. The Second 125%: Continuous Duty
  3. 125% vs. 120%: Two Different Rules
  4. Ampacity and the 75 °C Terminal Limit
  5. Ambient and Rooftop Temperature Correction
  6. Conduit Fill Adjustment
  7. When String Fuses Are Required
  8. Sizing the Inverter Output Breaker
  9. Voltage Drop

Disconnects, Rapid Shutdown and Fault Protection

pp. 29-35
  1. The PV System Disconnect
  2. Equipment Disconnects
  3. Rapid Shutdown: The Array Boundary
  4. Rapid Shutdown: 80 V and 30 V in 30 Seconds
  5. The Rapid Shutdown Initiator and Its Label
  6. DC Arc-Fault Protection
  7. Ground-Fault Protection

Grounding and Bonding

pp. 36-41
  1. Grounding vs. Bonding
  2. Sizing the Equipment Grounding Conductor
  3. Bonding Module Frames and Rails
  4. Grounding Electrode and GEC
  5. Functionally Grounded vs. Ungrounded Arrays
  6. Protecting a Small Exposed EGC

Interconnection

pp. 42-49
  1. Supply Side or Load Side?
  2. The 120% Rule Step by Step
  3. 120% Rule Worked: 200 A Bus, 200 A Main
  4. Opposite End and the Do-Not-Relocate Label
  5. Downsizing the Main to Make Room
  6. The 100% Sum Rule and Center-Fed Panels
  7. Supply-Side Connection
  8. Utility Interconnection and Anti-Islanding

Storage, Mechanical and Safety

pp. 50-56
  1. AC-Coupled vs. DC-Coupled Storage
  2. Article 706: ESS Basics
  3. Battery Sizing: kWh, Depth of Discharge, Efficiency
  4. Roof Attachments and Flashing
  5. Fire Access Pathways
  6. Fall Protection
  7. DC Is Live in Daylight

Commissioning and Labels

pp. 57-62
  1. Commissioning in a Fixed Order
  2. Polarity and Voc Check
  3. Isc Check Against Irradiance
  4. Insulation Resistance Test
  5. Required Labels on One Map
  6. Troubleshooting a Low String

Exam Review

pp. 63-68
  1. What the PVIP Exam Covers
  2. Every Formula on One Page
  3. Round Up or Round Down?
  4. The Mix-Ups That Show Up Most
  5. Exam-Day Checklist
  6. The Whole Path, Recap

Who This Book Is For

You're moving into solar as an electrician

You already know wiring. The book shows you what changes on the DC side: cold Voc, rapid shutdown and the 120% rule, each drawn with its NEC section.

Your PVIP exam date is set

You review one topic per page at night, with every calculation solved in the same fixed steps, and finish with every formula on one page.

You already lead a crew

You know how to do it on the roof. The book draws the why, so you can explain it to the inspector, to your crew and on the exam.

Plus: 2 Free Books

PV Installation Exam Practice Workbook
BONUS 1

PV Installation Exam Practice Workbook

Exam-style questions on string sizing, conductor sizing, the 120% rule and rapid shutdown, each answer worked step by step so you see exactly where you went wrong.

15 Common PV Install Mistakes, Before and After
BONUS 2

15 Common PV Install Mistakes, Before and After

The most frequent errors on the roof and in the calculations, each drawn wrong and then right, so you can review them in one sitting before the exam.

30-Day Guarantee

30-day guarantee: if a file doesn't open, if the content isn't what the product page describes, if you were charged twice or the email never arrived, write to us and we'll refund you in full. You pay once. No subscriptions.

Frequently Asked Questions

Is it for me if I already install PV and want the NABCEP PVIP?

Yes. It doesn't explain what a panel is. It goes straight to what the exam asks: string sizing, conductors and OCPD, rapid shutdown, grounding, interconnection, storage and commissioning, each drawn on its own page. The Code Book gives you the rule in text; here it's drawn, with the NEC section beside it, and every calculation is solved in the same fixed steps.

Where does the content come from?

From the NEC 2023 (NFPA 70), Articles 690, 705 and 706 plus 110, 250 and 310, cross-checked against the NABCEP PVIP Job Task Analysis. Before your exam, check which NEC edition NABCEP lists in its current Candidate Handbook. On the job, your state may have adopted another edition, and your AHJ can add local amendments.

Is it official material?

No. It's an independent illustrated study guide, not affiliated with NABCEP or NFPA.

Does it replace a training course?

No. It's a study and review book. It doesn't count toward NABCEP training hours, it doesn't give you a certificate, and it doesn't replace your field experience or the Code Book itself.

Are the practice questions the ones on the exam?

No. They are written for this book, in exam style, with each answer worked step by step. They are not official NABCEP questions.

When and how do I get it?

The book and the 2 bonus books come as PDFs by email, to the address you enter at checkout.

Do I have to pay every month?

No. It's a one-time payment. No subscription.

Can I have it on paper?

Yes. The PDF is printable, so you can print it at home or at a print shop and keep it in the truck.

How does the refund work?

You have 30 days. We refund everything if the file won't open, if the book isn't what you see on this page, if you were charged twice or if the email doesn't arrive: just email us.

US$ 27US$ 63
Get the book · US$ 27

This is a digital PDF book sent to your email: nothing is printed or shipped.