Study in Pictures🌐 English (United Kingdom)
Party Wall Surveying Illustrated

Digital book in PDF · read it on your phone or print it

Party Wall Surveying Illustrated

For England and Wales. Notifiable works, the three notices, the 3 m and 6 m rules, the 14-day reply, surveyors, schedules of condition and awards. Each topic has its own page: the drawing first, then what you need to remember.

  • 65 illustrated pages
  • English
  • 30-day guarantee
£19.99£57.99
Get the book · £19.99

Price shown for: United Kingdom. In other countries, the checkout shows the price that applies there.

About this book

What it is

For England and Wales. Notifiable works, the three notices, the 3 m and 6 m rules, the 14-day reply, surveyors, schedules of condition and awards. Each topic has its own page: the drawing first, then what you need to remember.

Who This Book Is For
  • You're adding party wall work
  • A notice is about to go out
  • You already run the jobs
What it covers
  1. The Act at a glance
  2. Is it notifiable?
  3. Serving notices
  4. Replies and time limits
  5. Surveyors and disputes
  6. Schedule of condition
  7. The award
  8. Worked example and review
Language
English (United Kingdom)
Pages
65
Format
Digital book in PDF · read it on your phone or print it
Price
£19.99 (United Kingdom)
Delivery
This is a digital PDF book sent to your email: nothing is printed or shipped.
30-Day Guarantee
30-day guarantee: if a file doesn't open, if the content isn't what the product page describes, if you were charged twice or the email never arrived, write to us and we'll refund you in full.

Look Inside the Book

Works → notice → reply → if disputed: surveyor, schedule, award → works → making good
Works → notice → reply → if disputed: surveyor, schedule, award → works → making good
Projecting footings allowed with compensation; special foundations only with prior written consent.
Projecting footings allowed with compensation; special foundations only with prior written consent.
Section 1 and section 6: 1 month · Section 3: 2 months, all as minimums
Section 1 and section 6: 1 month · Section 3: 2 months, all as minimums
From service: 14 days to reply; at least 1 month (s.1, s.6) or 2 months (s.3) to start
From service: 14 days to reply; at least 1 month (s.1, s.6) or 2 months (s.3) to start
Agreed surveyor vs two surveyors: both settle the dispute by award (s.10(1))
Agreed surveyor vs two surveyors: both settle the dispute by award (s.10(1))
Not required by the Act, but the booklet calls it 'most prudent' and it may be annexed to the award.
Not required by the Act, but the booklet calls it 'most prudent' and it may be annexed to the award.
Section 10(12): the right to do the work, when and how, and any other matter, including costs
Section 10(12): the right to do the work, when and how, and any other matter, including costs
Loft beams = s.3 notice, 2 months · 1 m deep footing within 3 m, below the neighbours' foundations = s.6 notice, 1 month
Loft beams = s.3 notice, 2 months · 1 m deep footing within 3 m, below the neighbours' foundations = s.6 notice, 1 month

Take a Look at the 8 Parts and 61 Topics

The Act at a glance

pp. 5-11
  1. What the Act actually does
  2. England and Wales only
  3. Party wall: the two types
  4. Party fence wall and party structure
  5. Building owner and adjoining owner
  6. What the Act doesn't cover
  7. The traffic light used in this book

Is it notifiable?

pp. 12-21
  1. Section 1: a new wall on the line of junction
  2. Section 1: footings under the neighbour's land
  3. Section 2: the work list for existing party walls
  4. Loft beams cut into the party wall
  5. Removing a chimney breast
  6. Minor works that usually aren't notifiable
  7. The 3 m rule
  8. The 6 m rule and the 45° line
  9. Measuring for the 3 m and 6 m rules
  10. One job, several notices

Serving notices

pp. 22-29
  1. The three notices side by side
  2. What a party structure notice must contain
  3. What a line of junction notice must contain
  4. What an adjacent excavation notice must contain
  5. Who to serve: finding every owner
  6. How to serve a notice
  7. 12 months to start the work
  8. Frequent errors in notices

Replies and time limits

pp. 30-36
  1. The timeline from notice to start
  2. The 14-day reply
  3. Silence is not consent
  4. Section 1 without consent
  5. The neighbour's counter-notice
  6. Shortening the periods by agreement
  7. The 10-day request to appoint

Surveyors and disputes

pp. 37-43
  1. Agreed surveyor or two surveyors
  2. The third surveyor
  3. Who can act as a surveyor
  4. Appointments and selections in writing
  5. The surveyor's duty: impartial
  6. Who pays the costs
  7. When to call a solicitor

Schedule of condition

pp. 44-50
  1. Why a schedule of condition
  2. When and where to inspect
  3. Room-by-room order
  4. Recording cracks
  5. Finishes, damp and the outside
  6. The photo log
  7. After the works: the check

The award

pp. 51-58
  1. What an award decides
  2. How an award is laid out
  3. Drawings and the schedule annexed
  4. Working hours and methods
  5. Access to the neighbour's land
  6. Security for expenses
  7. Serving the award and the 14-day appeal
  8. Damage and making good

Worked example and review

pp. 59-65
  1. Worked example: the terraced house
  2. Worked example: notices and replies
  3. Worked example: from surveyors to award
  4. The decision diagram
  5. Frequent errors from start to finish
  6. Checklist before you serve
  7. Glossary at a glance

Who This Book Is For

You're adding party wall work

The whole procedure in one order, from notifiable works to the award, so you can offer the service without leaning on someone else.

A notice is about to go out

The three notices, what each must contain and every time limit drawn on a timeline, so you serve the right one on the right date.

You already run the jobs

Schedules of condition, award layout and the traffic light for when to call a surveyor or solicitor, to check at a glance before a meeting.

Plus: 2 Free Books

Notifiable or Not? 40 Job Scenarios
BONUS 1

Notifiable or Not? 40 Job Scenarios

Practise deciding which notice a job needs, if any, with 40 everyday scenarios and a drawn answer for each one.

Party Wall Quick-Reference Cards
BONUS 2

Party Wall Quick-Reference Cards

The notices, time limits and award parts on printable cards, so you can check the order at a glance on site or before a meeting.

30-Day Guarantee

30-day guarantee: if a file doesn't open, if the content isn't what the product page describes, if you were charged twice or the email never arrived, write to us and we'll refund you in full. You pay once. No subscriptions.

Frequently Asked Questions

Is it for me if I'm a builder or surveyor taking on party wall work?

Yes. It goes from the checklist of notifiable works to how an award is laid out, with a worked example. It also helps homeowners planning a loft or extension who want to do it properly with next door.

Where does the content come from?

From the Party Wall etc. Act 1996 and the current government explanatory booklet for England and Wales, explained with our own drawings. Scotland and Northern Ireland have a different regime, and the book says so.

Is it official material?

No. It's an independent study and reference guide. It has no link to any government body or professional institution.

Does it replace training or legal advice?

No. It isn't legal advice. Every page has a traffic light that shows when you can carry on and when to call in a party wall surveyor or a solicitor.

Does it give me a qualification or a CPD certificate?

No. It's a study and reference book, not a course, so there's no certificate. The 40 job scenarios in the bonus book are written for this book and aren't taken from any exam or official source.

When and how do I get it?

The book and the 2 bonus books arrive as PDFs by email, at the address you enter at checkout.

Do I have to pay every month?

No. It's a one-off payment.

Can I have it on paper?

Yes. The PDF prints well at home or at a print shop, so you can keep it on site or in the van.

How does the refund work?

You have 30 days. We refund everything if the file won't open, if the book isn't what you see on this page, if you were charged twice or if the email doesn't arrive: just email us.

£19.99£57.99
Get the book · £19.99

This is a digital PDF book sent to your email: nothing is printed or shipped.