Study in Pictures🌐 English (United Kingdom)
Lightning Protection Illustrated

Digital book in PDF · read it on your phone or print it

Lightning Protection Illustrated

The path of a strike, the rolling sphere, down conductors and the test joint, separation distance, earth electrodes, bonding and SPDs, the earth test and the roof-to-earth inspection. Each topic has its own page: the drawing first, then what you need to remember.

  • 68 illustrated pages
  • English
  • 30-day guarantee
£19.99£57.99
Get the book · £19.99

Price shown for: United Kingdom. In other countries, the checkout shows the price that applies there.

About this book

What it is

The path of a strike, the rolling sphere, down conductors and the test joint, separation distance, earth electrodes, bonding and SPDs, the earth test and the roof-to-earth inspection. Each topic has its own page: the drawing first, then what you need to remember.

Who This Book Is For
  • You're taking on lightning protection work
  • You inspect and test on site
  • You sign off the building's inspection
What it covers
  1. How a Strike Travels
  2. Standards, Risk and Class
  3. Air Termination
  4. Down Conductors and Separation
  5. Earthing
  6. Bonding and Surge Protection
  7. Inspection from Roof to Earth
  8. Testing
  9. Defects, Reports and Revision
Language
English (United Kingdom)
Pages
68
Format
Digital book in PDF · read it on your phone or print it
Price
£19.99 (United Kingdom)
Delivery
This is a digital PDF book sent to your email: nothing is printed or shipped.
30-Day Guarantee
30-day guarantee: if a file doesn't open, if the content isn't what the product page describes, if you were charged twice or the email never arrived, write to us and we'll refund you in full.

Look Inside the Book

The full route of a strike: air termination, down conductor, test joint, earth electrode.
The full route of a strike: air termination, down conductor, test joint, earth electrode.
Class III mesh of 15 × 15 m, with ridge conductors above a 1 in 10 slope.
Class III mesh of 15 × 15 m, with ridge conductors above a 1 in 10 slope.
Straight down the wall, never in a gutter or downpipe, never in a loop
Straight down the wall, never in a gutter or downpipe, never in a loop
10 Ω or less is recommended; the electrode length rule is the design check
10 Ω or less is recommended; the electrode length rule is the design check
Gap ≥ s: isolate. Gap < s: bond, and add Type 1 SPDs where services are involved.
Gap ≥ s: isolate. Gap < s: bond, and add Type 1 SPDs where services are involved.
Clamp-on testing: valid on a parallel group, misleading on a single isolated rod.
Clamp-on testing: valid on a parallel group, misleading on a single isolated rod.
8 tick boxes from roof to record, in the same order as the book
8 tick boxes from roof to record, in the same order as the book
Sphere 20/30/45/60 m, mesh 5–20 m, spacing 10/10/15/20 m, 10 Ω recommended
Sphere 20/30/45/60 m, mesh 5–20 m, spacing 10/10/15/20 m, 10 Ω recommended

Take a Look at the 9 Parts and 64 Topics

How a Strike Travels

pp. 5-10
  1. The path of a strike: roof to earth
  2. What a flash actually does
  3. Direct strike, nearby strike, strike to a service
  4. External and internal protection: two halves of one system
  5. Lightning Protection Zones in one drawing
  6. What the old BS 6651 did differently

Standards, Risk and Class

pp. 11-16
  1. The four parts of BS EN 62305 on one page
  2. Risk assessment in plain steps
  3. Collection area: a worked example
  4. Lightning Protection Levels I to IV
  5. Class of LPS and the numbers that follow it
  6. Other UK rules on the same job

Air Termination

pp. 17-25
  1. Three ways to place air terminations
  2. The rolling sphere: roll the ball over the drawing
  3. The protective angle: a worked example
  4. The mesh method on flat and pitched roofs
  5. Natural air terminations: metal roofs and parapets
  6. Roof plant, aerials and solar panels
  7. Spires, towers and chimneys
  8. Conductor sizes and materials
  9. Fixings, expansion and supports

Down Conductors and Separation

pp. 26-32
  1. How many down conductors, and where
  2. The shortest, straightest route
  3. Natural down conductors: steel frames and rebar
  4. The test joint
  5. Separation distance: what it is
  6. Separation distance: a worked example
  7. Protection against touch and step voltage

Earthing

pp. 33-40
  1. Why the earth electrode matters most
  2. Type A arrangement: rods and radials
  3. Type B arrangement: the ring earth
  4. Foundation earth electrodes
  5. Soil resistivity in ohm-metres
  6. The 10 Ω target and what it really says
  7. Rods, couplers and driving depth
  8. Earth pits and inspection chambers

Bonding and Surge Protection

pp. 41-47
  1. Lightning equipotential bonding
  2. Bonding versus isolating
  3. Joining dissimilar metals
  4. SPD Type 1, Type 2, Type 3
  5. Where each SPD goes
  6. Keeping SPD leads short
  7. Data, telecom and other incoming lines

Inspection from Roof to Earth

pp. 48-54
  1. Visual inspection and full inspection
  2. Before you go up: drawings and safety
  3. Step 1: air terminations and roof conductors
  4. Step 2: roof plant and later additions
  5. Step 3: down conductors and fixings
  6. Step 4: test joints and ground level
  7. Step 5: earth pits and bonding

Testing

pp. 55-62
  1. Test instruments and what each one reads
  2. Earth test at the test joint in 5 steps
  3. Fall-of-potential method
  4. Clamp-on (stakeless) testing
  5. Continuity of conductors and bonds
  6. Overall earth: combining the readings
  7. A reading looks wrong: what to check first
  8. Filling in the test record

Defects, Reports and Revision

pp. 63-68
  1. The most frequent roof defects
  2. The most frequent ground-level defects
  3. Writing the report for the client
  4. Remedial work: in what order
  5. Roof-to-earth checklist
  6. Numbers to keep in the van

Who This Book Is For

You're taking on lightning protection work

If you're an electrician moving into lightning protection, you get the whole system in order, roof to earth, with every rule drawn instead of buried in clauses.

You inspect and test on site

If you're a lightning protection engineer or steeplejack, you've done this for years: here the earth test, continuity and the test record sit in the same order every time, printed and kept in the van.

You sign off the building's inspection

If you're a facilities manager, you see what the inspection should cover and can read the test record with confidence.

Plus: 2 Free Books

Self-Check Workbook: 60 Questions from Roof to Earth
BONUS 1

Self-Check Workbook: 60 Questions from Roof to Earth

Check yourself on air terminations, test joints, bonding and earth readings, with every answer explained next to a drawing.

Common Defects Cards: Roof and Ground Level
BONUS 2

Common Defects Cards: Roof and Ground Level

The most frequent defects on roofs and at ground level, drawn wrong and right side by side, to print and keep in the van.

30-Day Guarantee

30-day guarantee: if a file doesn't open, if the content isn't what the product page describes, if you were charged twice or the email never arrived, write to us and we'll refund you in full. You pay once. No subscriptions.

Frequently Asked Questions

Is it for me if I've been doing lightning protection for years?

Yes. It isn't a beginner's course: it puts the whole system in one order, roof to earth, so you can check a detail quickly or explain it to a client with a drawing.

Where does the content come from?

It's written for UK work and checked against the BS EN 62305 series (Parts 1–4), with BS 7430 for earthing, BS EN 62561 for components and BS 7671 for surge protection. Every threshold, interval and clause reference is marked so you can check it against the edition in force.

Is it official material?

No. It's an independent illustrated book. It isn't affiliated with or endorsed by BSI or any trade association, and it doesn't reproduce the text or tables of the standards.

Does it replace training?

No. It doesn't replace training, the standards themselves or a site risk assessment. You don't need to work on supply or high-voltage systems to use it: it covers the lightning protection system itself and the earth test at the joint. Fitting SPDs inside the installation is an electrician's job under BS 7671, and work at height is covered in outline only.

Do I get a certificate, and are the practice questions from an exam?

No certificate: it's a study and reference book, not a course. The 60 questions in the workbook are written for this book to help you check yourself. They aren't official questions from any exam or assessment.

When and how does it arrive?

As a PDF by email, together with the 2 free books, to the address you enter at checkout.

Do I have to pay every month?

No. It's a one-off payment, with no subscription.

Can I have it on paper?

Yes. The PDF is laid out to print, at home or at a print shop, so you can keep it in the van and take it on site.

How does the refund work?

You have 30 days. We refund everything if the file won't open, if the book isn't what you see on this page, if you were charged twice or if the email doesn't arrive: just email us.

£19.99£57.99
Get the book · £19.99

This is a digital PDF book sent to your email: nothing is printed or shipped.